- Encrypted paymentCard details handled by Stripe
- Tracked worldwideFree on 3+ bottle bundles
- 30-day guaranteeMoney-back if it is not for you
- Clear labellingCoverage and results stated honestly
Stock up & save
Choose your RustGuard™ bundle
Prices in USD. Free tracked shipping on 3-bottle bundles and above.


Rusted metal in, paint-ready surface out
Brush RustGuard™ over sound rust, let it cure, then paint. Images are illustrative — results depend on surface condition and preparation.
Where rust shows up first
The areas worth checking before you order.
- Implement frames, toolbars and mounting brackets
- Field gates, hinges, latches and hanging posts
- Feeders, troughs and ring feeders
- Mower decks, topper housings and cutter bar frames
- Trailer chassis, silage trailers and muck spreader bodies
- Handling systems, race panels and hurdles
Step-by-step on this job
- 01
Power wash and let it dry properly
Chemical residues from fertiliser and slurry must come off or they will keep attacking the steel under any film.
- 02
Knock off the flakes
A scraper and wire brush on the worst areas. Agricultural rust is often layered scale — get it down to something solid.
- 03
Degrease around bearings and pivots
Grease migrates further than you expect. Degrease generously, and mask what you cannot clean.
- 04
Brush on, one section at a time
Work in panels so nothing dries before you have covered it. Two coats on heavily pitted plate.
- 05
Topcoat with agricultural enamel
After 24 hours. Matching machinery colours is straightforward once the converted layer is your primer.

What not to do
The cautions that save a re-do.
- Not for surfaces in direct contact with feed or drinking water until the topcoat is fully cured
- Keep it off PTO shafts, hydraulic rams and greased pivots
- Cover hydraulic hoses, wiring and decals before starting
- Structural members that have thinned should be inspected before being coated
Typical quantities
A starting point based on the jobs customers order for most often.
| Job | Bottles |
|---|---|
| Field gate and hinges | 1 bottle |
| Ring feeder or trough | 1 bottle |
| Mower deck or topper | 2 bottles |
| Implement frame and toolbar | 3 bottles |
| Silage trailer body and chassis | 5–8 bottles |
Work out your exact quantity
Area
100 sq ft
Bottles needed
3
Recommended bundle
×3 — $42
Based on up to 55 sq ft per bottle on smooth steel, adjusted for surface condition. Estimates only — measure generously.
Frequently asked questions
Is it safe around livestock?
Once the converter and topcoat are fully cured, treated gates and panels are as safe as any painted steel. Keep animals away while wet and curing.
Can I use it on feed troughs?
On the outside and frame, yes. For food-contact surfaces, follow the topcoat manufacturer's guidance on suitability.
What about galvanised hurdles?
Treat only where red rust shows through. Sound galvanising should be left alone.
Does slurry attack the treated film?
Aggressive chemical exposure shortens the life of any coating. A tough topcoat and annual touch-up is the realistic maintenance cycle.
Keep reading
- Rust converter for fences, gates and railingsRestore rusted wrought iron gates, railings and fence panels. RustGuard™ converts rust in place and primes for your finish coat.
- Rust converter for industrial and structural steelMaintenance coating for structural steelwork, plant, tanks and handrails. Coverage planning, prep grades and topcoat systems.
- Rust converter for iron and steel that leaves a paint-ready surfaceRustGuard™ rust converter reacts with existing rust and leaves a stable, primed surface you can paint. Bundles from $24 with worldwide shipping.
- Rust prevention guideA practical prevention programme for vehicles, tools and outdoor steel — coatings, drainage, storage, salt management and an inspection schedule.
- Rust converter safety, storage and disposalPPE, ventilation, storage temperatures, spill handling and correct disposal for water-based rust converter. Practical safety guidance.
Stock up & save
Choose your RustGuard™ bundle
Ships from our US fulfilment partner, typically 3–7 business days. 30-day money-back guarantee.
